Hecate Grid Intrepid 1 LLC — Interconnection Portfolio
Hecate Grid Intrepid 1 LLC is associated with 2 tracked interconnection projects representing 300 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
2Projects
0Active
0Operational
2Withdrawn
300 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 2 | 300 MW |
Geographic footprint
| State | Projects |
|---|---|
| New York | 2 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Intrepid Storage 138 | 0918 | Battery | 250.0 MW | withdrawn | Nassau, New York |
| Intrepid Storage 69 | 0912 | Battery | 50.0 MW | withdrawn | Nassau, New York |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.