02 37MW Franklin PUD,Franklin Riverview (G70-02)

02 37MW Franklin PUD,Franklin Riverview is a 37.0 MW gas interconnection project in Franklin, Washington with a current status of withdrawn. It is proposed to connect at Franklin PUD's Oregon Street Substation.

37.0 MWCapacity
WithdrawnStatus
WAMarket
GasTechnology

Project facts

Canonical name02 37MW Franklin PUD,Franklin Riverview
Queue IDG70-02
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyGas
Capacity37.0 MW
StateWashington
CountyFranklin
Point of interconnectionFranklin PUD's Oregon Street Substation
Requested (queue) date2001-08-14
Proposed in-service date2002-06-01
Operational date
Withdrawn date
DeveloperEffective Energy Corporation
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata