114 Hartley Rd-Goshen (0910)

114 Hartley Rd-Goshen is a 10.0 MW battery interconnection project in Orange, New York with a current status of withdrawn. It is proposed to connect at Hartley Substation 13.2kV.

10.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical name114 Hartley Rd-Goshen
Queue ID0910
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity10.0 MW
StateNew York
CountyOrange
Point of interconnectionHartley Substation 13.2kV
Requested (queue) date2019-09-24
Proposed in-service date2020-02-29
Operational date
Withdrawn date
DeveloperHartley Rd Energy Storage 1, LLC
Utility / transmission ownerO&R

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.