1200 MW (+/- 400 kV) HVDC External ETU (1381)

1200 MW (+/- 400 kV) HVDC External ETU is a 1,200.0 MW generation interconnection project in Grafton, New Hampshire with a current status of withdrawn. It is proposed to connect at In New Hampshire, the point of interconnection is near the old Monroe yard (AC capacitors and reactors and Phase II filters presently reside in this yard). The project will tie into the currently existing Comerford 230 kV substation. The northern section of the project will connect with the Hydro-Quebec system at the US-Canada border near Canaan, Vermont..

1,200.0 MWCapacity
WithdrawnStatus
NHMarket
GenerationTechnology

Project facts

Canonical name1200 MW (+/- 400 kV) HVDC External ETU
Queue ID1381
Statuswithdrawn
Source statusW
MarketNH
TechnologyGeneration
Capacity1,200.0 MW
StateNew Hampshire
CountyGrafton
Point of interconnectionIn New Hampshire, the point of interconnection is near the old Monroe yard (AC capacitors and reactors and Phase II filters presently reside in this yard). The project will tie into the currently existing Comerford 230 kV substation. The northern section of the project will connect with the Hydro-Quebec system at the US-Canada border near Canaan, Vermont.
Requested (queue) date2023-04-11
Proposed in-service date2029-07-01
Operational date
Withdrawn date2025-03-26
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.