1200 MW Data Center Loads (L0649)

1200 MW Data Center Loads is a 1,200.0 MW other interconnection project with a current status of active. It is proposed to connect at Between #37/1 & 32/1 on the Lower Monumental-McNary 500kV line.

1,200.0 MWCapacity
ActiveStatus
—Market
OtherTechnology

Project facts

Canonical name1200 MW Data Center Loads
Queue IDL0649
Statusactive
Source statusSTUDY
Market—
TechnologyOther
Capacity1,200.0 MW
State—
CountyWalla Walla
Point of interconnectionBetween #37/1 & 32/1 on the Lower Monumental-McNary 500kV line
Requested (queue) date2025-04-03
Proposed in-service date2028-04-07
Operational date—
Withdrawn date—
DeveloperColumbia Rural Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—activehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata