1200 MW non-controllable ETU - N to S flow only (1227)
1200 MW non-controllable ETU - N to S flow only is a 1,200.0 MW generation interconnection project in Somerset/Aroostook, Maine with a current status of withdrawn. It is proposed to connect at New substation on Line 3023 near the Detroit Substation near Pittsfield, Maine..
1,200.0 MWCapacity
WithdrawnStatus
MEMarket
GenerationTechnology
Project facts
| Canonical name | 1200 MW non-controllable ETU - N to S flow only |
|---|---|
| Queue ID | 1227 |
| Status | withdrawn |
| Source status | W |
| Market | ME |
| Technology | Generation |
| Capacity | 1,200.0 MW |
| State | Maine |
| County | Somerset/Aroostook |
| Point of interconnection | New substation on Line 3023 near the Detroit Substation near Pittsfield, Maine. |
| Requested (queue) date | 2022-02-16 |
| Proposed in-service date | 2026-12-09 |
| Operational date | — |
| Withdrawn date | 2024-09-04 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.