1200 MW non-controllable ETU - N to S flow only (1228)

1200 MW non-controllable ETU - N to S flow only is a 1,200.0 MW generation interconnection project in Hancock/Aroostook, Maine with a current status of withdrawn. It is proposed to connect at New substation on Line 388.

1,200.0 MWCapacity
WithdrawnStatus
MEMarket
GenerationTechnology

Project facts

Canonical name1200 MW non-controllable ETU - N to S flow only
Queue ID1228
Statuswithdrawn
Source statusW
MarketME
TechnologyGeneration
Capacity1,200.0 MW
StateMaine
CountyHancock/Aroostook
Point of interconnectionNew substation on Line 388
Requested (queue) date2022-02-16
Proposed in-service date2026-12-09
Operational date
Withdrawn date2024-09-04
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata