1200 MW non-controllable ETU - N to S flow only is a 1,200.0 MW generation interconnection project in Somerset/Aroostook, Maine with a current status of withdrawn. It is proposed to connect at The Point of Interconnection will be a new station about 30 miles from Orrington that taps the existing segment 3023 between Orrington and Albion Rd. Hammond, ME to Pittsfield ME (see map).

1,200.0 MWCapacity
WithdrawnStatus
MEMarket
GenerationTechnology

Project facts

Canonical name1200 MW non-controllable ETU - N to S flow only
Queue ID1230
Statuswithdrawn
Source statusW
MarketME
TechnologyGeneration
Capacity1,200.0 MW
StateMaine
CountySomerset/Aroostook
Point of interconnectionThe Point of Interconnection will be a new station about 30 miles from Orrington that taps the existing segment 3023 between Orrington and Albion Rd. Hammond, ME to Pittsfield ME (see map)
Requested (queue) date2022-03-04
Proposed in-service date2027-12-01
Operational date
Withdrawn date2025-10-11
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata