125 MW 115 kV Sacajawea Tap (L0637)
125 MW 115 kV Sacajawea Tap is a 125.0 MW other interconnection project in Walla Walla, Washington with a current status of operational.
125.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | 125 MW 115 kV Sacajawea Tap |
|---|---|
| Queue ID | L0637 |
| Status | operational |
| Source status | BPA COMPLETED |
| Market | WA |
| Technology | Other |
| Capacity | 125.0 MW |
| State | Washington |
| County | Walla Walla |
| Point of interconnection | — |
| Requested (queue) date | 2024-12-11 |
| Proposed in-service date | — |
| Operational date | 2027-12-16 |
| Withdrawn date | — |
| Developer | Columbia Rural Electric Association |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata