130 MW Uprate (0202)
130 MW Uprate is a 130.0 MW gas interconnection project in Ny-nj, New York with a current status of withdrawn. It is proposed to connect at Goethal 345kV.
130.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology
Project facts
| Canonical name | 130 MW Uprate |
|---|---|
| Queue ID | 0202 |
| Status | withdrawn |
| Source status | 0 |
| Market | — |
| Technology | Gas |
| Capacity | 130.0 MW |
| State | New York |
| County | Ny-nj |
| Point of interconnection | Goethal 345kV |
| Requested (queue) date | 2005-08-25 |
| Proposed in-service date | 2019-03-06 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Liberty Generating Co. |
| Utility / transmission owner | CONED |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.