161kV bus at Karma substation (J1313)

161kV bus at Karma substation is a 100.0 MW solar interconnection project in Greene County, Iowa with a current status of operational. It is proposed to connect at 161kV bus at Karma substation.

100.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical name161kV bus at Karma substation
Queue IDJ1313
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity100.0 MW
StateIowa
CountyGreene County
Point of interconnection161kV bus at Karma substation
Requested (queue) date2019-04-29
Proposed in-service date2022-06-30
Operational date2022-06-30
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata