161kV bus at Karma substation (J1313)
161kV bus at Karma substation is a 100.0 MW solar interconnection project in Greene County, Iowa with a current status of operational. It is proposed to connect at 161kV bus at Karma substation.
100.0 MWCapacity
OperationalStatus
—Market
SolarTechnology
Project facts
| Canonical name | 161kV bus at Karma substation |
|---|---|
| Queue ID | J1313 |
| Status | operational |
| Source status | Done |
| Market | — |
| Technology | Solar |
| Capacity | 100.0 MW |
| State | Iowa |
| County | Greene County |
| Point of interconnection | 161kV bus at Karma substation |
| Requested (queue) date | 2019-04-29 |
| Proposed in-service date | 2022-06-30 |
| Operational date | 2022-06-30 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ITC MIDWEST |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata