16th Avenue (L0377)

16th Avenue is a 8.7 MW other interconnection project in Spokane, Washington with a current status of operational. It is proposed to connect at Sullivan 115kV Substation.

8.7 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical name16th Avenue
Queue IDL0377
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyOther
Capacity8.7 MW
StateWashington
CountySpokane
Point of interconnectionSullivan 115kV Substation
Requested (queue) date2014-10-10
Proposed in-service date
Operational date2016-07-01
Withdrawn date
DeveloperVera Water & Power
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata