1st Avenue 20 MW ESS Project (1268)

1st Avenue 20 MW ESS Project is a 20.0 MW battery interconnection project in Kings, New York with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
JMarket
BatteryTechnology

Project facts

Canonical name1st Avenue 20 MW ESS Project
Queue ID1268
Statuswithdrawn
Source status0
MarketJ
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyKings
Point of interconnection
Requested (queue) date2021-09-28
Proposed in-service date2021-11-30
Operational date
Withdrawn date
DeveloperMicrogrid Networks, LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.