230 kV Feed from Longview Substation to Alcoa (L0693)
230 kV Feed from Longview Substation to Alcoa is a 240.0 MW other interconnection project with a current status of active. It is proposed to connect at Cowlitz Substation.
240.0 MWCapacity
ActiveStatus
—Market
OtherTechnology
Project facts
| Canonical name | 230 kV Feed from Longview Substation to Alcoa |
|---|---|
| Queue ID | L0693 |
| Status | active |
| Source status | STUDY |
| Market | — |
| Technology | Other |
| Capacity | 240.0 MW |
| State | — |
| County | Cowlitz, Wa |
| Point of interconnection | Cowlitz Substation |
| Requested (queue) date | 2026-04-30 |
| Proposed in-service date | 2029-05-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Public Utility District No. 1 of Cowlitz County |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata