250MW Covington-Chehalis,Tacoma-Olympia (G40)

250MW Covington-Chehalis,Tacoma-Olympia is a 250.0 MW gas interconnection project in Pierce, Washington with a current status of withdrawn. It is proposed to connect at 230 kV Covington-Chehalis and/or Tacoma-Olympia lines.

250.0 MWCapacity
WithdrawnStatus
WAMarket
GasTechnology

Project facts

Canonical name250MW Covington-Chehalis,Tacoma-Olympia
Queue IDG40
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyGas
Capacity250.0 MW
StateWashington
CountyPierce
Point of interconnection230 kV Covington-Chehalis and/or Tacoma-Olympia lines
Requested (queue) date2001-04-06
Proposed in-service date2001-05-01
Operational date
Withdrawn date
DeveloperCalpine Energy Services, L.P.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata