300MW Lower Monumental-Starbuck (G77)

300MW Lower Monumental-Starbuck is a 300.0 MW wind interconnection project in Columbia, Washington with a current status of withdrawn. It is proposed to connect at Lower Monumental-Starbuck 500 kV line..

300.0 MWCapacity
WithdrawnStatus
WAMarket
WindTechnology

Project facts

Canonical name300MW Lower Monumental-Starbuck
Queue IDG77
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyWind
Capacity300.0 MW
StateWashington
CountyColumbia
Point of interconnectionLower Monumental-Starbuck 500 kV line.
Requested (queue) date2001-09-21
Proposed in-service date2004-06-01
Operational date
Withdrawn date
DeveloperRES North America
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.