345 kV AC line from Quebec to ME (661)

345 kV AC line from Quebec to ME is a 450.0 MW generation interconnection project in Franklin, Maine with a current status of withdrawn. It is proposed to connect at CMP/Avangrid 345 kV Larabee Road.

450.0 MWCapacity
WithdrawnStatus
MEMarket
GenerationTechnology

Project facts

Canonical name345 kV AC line from Quebec to ME
Queue ID661
Statuswithdrawn
Source statusW
MarketME
TechnologyGeneration
Capacity450.0 MW
StateMaine
CountyFranklin
Point of interconnectionCMP/Avangrid 345 kV Larabee Road
Requested (queue) date2017-07-20
Proposed in-service date2022-12-01
Operational date
Withdrawn date2018-04-12
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata