345 kV Tie - Phase 1 is a 200.0 MW generation interconnection project in Aroostook, Maine with a current status of withdrawn. It is proposed to connect at Houlton, ME to MEPCO 396 Line.
200.0 MWCapacity
WithdrawnStatus
BHEMarket
GenerationTechnology
Project facts
| Canonical name | 345 kV Tie - Phase 1 |
|---|---|
| Queue ID | 502 |
| Status | withdrawn |
| Source status | W |
| Market | BHE |
| Technology | Generation |
| Capacity | 200.0 MW |
| State | Maine |
| County | Aroostook |
| Point of interconnection | Houlton, ME to MEPCO 396 Line |
| Requested (queue) date | 2015-02-16 |
| Proposed in-service date | 2016-12-01 |
| Operational date | — |
| Withdrawn date | 2015-04-17 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata