345 kV Tie - Phase 1 (502)

345 kV Tie - Phase 1 is a 200.0 MW generation interconnection project in Aroostook, Maine with a current status of withdrawn. It is proposed to connect at Houlton, ME to MEPCO 396 Line.

200.0 MWCapacity
WithdrawnStatus
BHEMarket
GenerationTechnology

Project facts

Canonical name345 kV Tie - Phase 1
Queue ID502
Statuswithdrawn
Source statusW
MarketBHE
TechnologyGeneration
Capacity200.0 MW
StateMaine
CountyAroostook
Point of interconnectionHoulton, ME to MEPCO 396 Line
Requested (queue) date2015-02-16
Proposed in-service date2016-12-01
Operational date
Withdrawn date2015-04-17
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata