345kV Allen Junction to Morocco (J1639)

345kV Allen Junction to Morocco is a 100.0 MW battery interconnection project in Lenawee, Michigan with a current status of withdrawn. It is proposed to connect at 345kV Allen Junction to Morocco.

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical name345kV Allen Junction to Morocco
Queue IDJ1639
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StateMichigan
CountyLenawee
Point of interconnection345kV Allen Junction to Morocco
Requested (queue) date2020-06-24
Proposed in-service date2022-02-01
Operational date2022-02-01
Withdrawn date2022-01-06
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata