345kV Transmission Line from Antelope Valley to Leland Olds Substation (GEN-2021-072)

345kV Transmission Line from Antelope Valley to Leland Olds Substation is a 600.0 MW solar interconnection project in Mercer, North Dakota with a current status of withdrawn. It is proposed to connect at 345kV Transmission Line from Antelope Valley to Leland Olds Substation.

600.0 MWCapacity
WithdrawnStatus
NDMarket
SolarTechnology

Project facts

Canonical name345kV Transmission Line from Antelope Valley to Leland Olds Substation
Queue IDGEN-2021-072
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologySolar
Capacity600.0 MW
StateNorth Dakota
CountyMercer
Point of interconnection345kV Transmission Line from Antelope Valley to Leland Olds Substation
Requested (queue) date2021-05-19
Proposed in-service date2027-12-01
Operational date
Withdrawn date2024-09-16
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata