500MW Custer-[Intalco,Portal Way] 2 (G25)

500MW Custer-[Intalco,Portal Way] 2 is a 500.0 MW gas interconnection project in Whatcom, Washington with a current status of withdrawn. It is proposed to connect at Custer-Inalco/Portal Way 230 kV transmission line.

500.0 MWCapacity
WithdrawnStatus
WAMarket
GasTechnology

Project facts

Canonical name500MW Custer-[Intalco,Portal Way] 2
Queue IDG25
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyGas
Capacity500.0 MW
StateWashington
CountyWhatcom
Point of interconnectionCuster-Inalco/Portal Way 230 kV transmission line
Requested (queue) date2001-02-15
Proposed in-service date2004-06-01
Operational date
Withdrawn date
DeveloperCalpine Energy Services, L.P.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata