500MW Taft-Bell (G16)

500MW Taft-Bell is a 500.0 MW gas interconnection project in Kootenai, Idaho with a current status of withdrawn. It is proposed to connect at BPA's Taft-Bell 500 kV line in the vicinity of Kootenaid County, ID.

500.0 MWCapacity
WithdrawnStatus
IDMarket
GasTechnology

Project facts

Canonical name500MW Taft-Bell
Queue IDG16
Statuswithdrawn
Source statusWITHDRAWN
MarketID
TechnologyGas
Capacity500.0 MW
StateIdaho
CountyKootenai
Point of interconnectionBPA's Taft-Bell 500 kV line in the vicinity of Kootenaid County, ID
Requested (queue) date2000-12-22
Proposed in-service date2004-12-01
Operational date
Withdrawn date
DeveloperCogentrix Energy, Inc.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata