50MW Alcoa-St Johns is a 50.0 MW gas interconnection project in Clark, Washington with a current status of withdrawn. It is proposed to connect at Tap of Alcoa-St. Johns 115 kV line.

50.0 MWCapacity
WithdrawnStatus
WAMarket
GasTechnology

Project facts

Canonical name50MW Alcoa-St Johns
Queue IDG22
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyGas
Capacity50.0 MW
StateWashington
CountyClark
Point of interconnectionTap of Alcoa-St. Johns 115 kV line
Requested (queue) date2001-02-16
Proposed in-service date2001-11-01
Operational date
Withdrawn date
DeveloperCalpine Energy Services, L.P.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata