5CLARK - 5PILTMA 161.0kV (J3202)

5CLARK - 5PILTMA 161.0kV is a 120.0 MW solar interconnection project in Iron, Missouri with a current status of withdrawn. It is proposed to connect at 5CLARK - 5PILTMA 161.0kV.

120.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical name5CLARK - 5PILTMA 161.0kV
Queue IDJ3202
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity120.0 MW
StateMissouri
CountyIron
Point of interconnection5CLARK - 5PILTMA 161.0kV
Requested (queue) date2022-09-15
Proposed in-service date2026-10-31
Operational date2026-10-31
Withdrawn date2025-10-27
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata