5STODDARD - 5MORLEY (AECI) 161.0kV (J3442)

5STODDARD - 5MORLEY (AECI) 161.0kV is a 156.0 MW solar interconnection project in Scott, Missouri with a current status of operational. It is proposed to connect at 5STODDARD - 5MORLEY (AECI) 161.0kV.

156.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical name5STODDARD - 5MORLEY (AECI) 161.0kV
Queue IDJ3442
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity156.0 MW
StateMissouri
CountyScott
Point of interconnection5STODDARD - 5MORLEY (AECI) 161.0kV
Requested (queue) date2024-04-16
Proposed in-service date2028-09-30
Operational date2028-09-30
Withdrawn date
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata