5STODDARD - 5MORLEY (AECI) 161kV (J2524)

5STODDARD - 5MORLEY (AECI) 161kV is a 200.0 MW solar interconnection project in Stoddard, Missouri with a current status of operational. It is proposed to connect at 5STODDARD - 5MORLEY (AECI) 161kV.

200.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical name5STODDARD - 5MORLEY (AECI) 161kV
Queue IDJ2524
Statusoperational
Source statusPending Revision Approval
Market
TechnologySolar
Capacity200.0 MW
StateMissouri
CountyStoddard
Point of interconnection5STODDARD - 5MORLEY (AECI) 161kV
Requested (queue) date2022-09-15
Proposed in-service date2026-11-01
Operational date2026-11-01
Withdrawn date
Developer
Utility / transmission ownerMISO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.