600 MW Monroe-Custer is a 600.0 MW gas interconnection project in Skagit, Washington with a current status of withdrawn. It is proposed to connect at Monroe-Custer 500 kV line near Sedro Wooley.

600.0 MWCapacity
WithdrawnStatus
WAMarket
GasTechnology

Project facts

Canonical name600 MW Monroe-Custer
Queue IDG38
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyGas
Capacity600.0 MW
StateWashington
CountySkagit
Point of interconnectionMonroe-Custer 500 kV line near Sedro Wooley
Requested (queue) date2001-03-22
Proposed in-service date2005-06-01
Operational date
Withdrawn date
DeveloperCalpine Energy Services, L.P.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata