600 MW Monroe-Custer (G38)
600 MW Monroe-Custer is a 600.0 MW gas interconnection project in Skagit, Washington with a current status of withdrawn. It is proposed to connect at Monroe-Custer 500 kV line near Sedro Wooley.
600.0 MWCapacity
WithdrawnStatus
WAMarket
GasTechnology
Project facts
| Canonical name | 600 MW Monroe-Custer |
|---|---|
| Queue ID | G38 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | WA |
| Technology | Gas |
| Capacity | 600.0 MW |
| State | Washington |
| County | Skagit |
| Point of interconnection | Monroe-Custer 500 kV line near Sedro Wooley |
| Requested (queue) date | 2001-03-22 |
| Proposed in-service date | 2005-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Calpine Energy Services, L.P. |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata