7Enon- 7Montgmry 345 KV (J2726)

7Enon- 7Montgmry 345 KV is a 248.0 MW solar interconnection project in Montgomery, Missouri with a current status of withdrawn. It is proposed to connect at 7Enon- 7Montgmry 345 KV.

248.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical name7Enon- 7Montgmry 345 KV
Queue IDJ2726
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity248.0 MW
StateMissouri
CountyMontgomery
Point of interconnection7Enon- 7Montgmry 345 KV
Requested (queue) date2022-09-15
Proposed in-service date2027-06-01
Operational date2027-06-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata