7MONTGMRY -7ENON 345kV (J2438)

7MONTGMRY -7ENON 345kV is a 150.0 MW battery interconnection project in Montgomery, Missouri with a current status of withdrawn. It is proposed to connect at 7MONTGMRY -7ENON 345kV.

150.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical name7MONTGMRY -7ENON 345kV
Queue IDJ2438
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity150.0 MW
StateMissouri
CountyMontgomery
Point of interconnection7MONTGMRY -7ENON 345kV
Requested (queue) date2022-09-13
Proposed in-service date2027-10-01
Operational date2027-10-01
Withdrawn date2023-03-24
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata