87th Street 345kV Substation (GEN-2023-007)

87th Street 345kV Substation is a 150.0 MW battery interconnection project in Johnson, Kansas with a current status of withdrawn. It is proposed to connect at 87th Street 345kV Substation.

150.0 MWCapacity
WithdrawnStatus
KSMarket
BatteryTechnology

Project facts

Canonical name87th Street 345kV Substation
Queue IDGEN-2023-007
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyBattery
Capacity150.0 MW
StateKansas
CountyJohnson
Point of interconnection87th Street 345kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2030-12-31
Operational date
Withdrawn date2023-11-27
Developer
Utility / transmission ownerEvergy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata