Aberdeen Biodiesel (L0489)
Aberdeen Biodiesel is a 275.0 MW other interconnection project in Grays Harbor, Washington with a current status of withdrawn. It is proposed to connect at Aberdeen Substation 230 kV.
275.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | Aberdeen Biodiesel |
|---|---|
| Queue ID | L0489 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | WA |
| Technology | Other |
| Capacity | 275.0 MW |
| State | Washington |
| County | Grays Harbor |
| Point of interconnection | Aberdeen Substation 230 kV |
| Requested (queue) date | 2021-04-27 |
| Proposed in-service date | 2025-01-02 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Public Utility District No. 1 of Cowlitz County |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata