Abilene Energy Center-Northview 115kV (GEN-2017-120)

Abilene Energy Center-Northview 115kV is a 260.0 MW wind interconnection project in Dickinson/Marion, Kansas with a current status of withdrawn. It is proposed to connect at Abilene Energy Center-Northview 115kV.

260.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameAbilene Energy Center-Northview 115kV
Queue IDGEN-2017-120
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity260.0 MW
StateKansas
CountyDickinson/Marion
Point of interconnectionAbilene Energy Center-Northview 115kV
Requested (queue) date2017-11-17
Proposed in-service date2028-03-31
Operational date
Withdrawn date2026-03-11
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.