AC Line (591)

AC Line is a 400.0 MW generation interconnection project in Cumberland, Maine with a current status of withdrawn. It is proposed to connect at CMP Surowiec Area.

400.0 MWCapacity
WithdrawnStatus
MEMarket
GenerationTechnology

Project facts

Canonical nameAC Line
Queue ID591
Statuswithdrawn
Source statusW
MarketME
TechnologyGeneration
Capacity400.0 MW
StateMaine
CountyCumberland
Point of interconnectionCMP Surowiec Area
Requested (queue) date2016-01-20
Proposed in-service date2019-11-30
Operational date
Withdrawn date2018-04-12
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata