AC to Larabee Road (652)

AC to Larabee Road is a 460.0 MW generation interconnection project in Lewiston, Maine with a current status of withdrawn. It is proposed to connect at Larrabee Road 345 kV Substation in Lewiston, Androscoggin county Maine 04240..

460.0 MWCapacity
WithdrawnStatus
MEMarket
GenerationTechnology

Project facts

Canonical nameAC to Larabee Road
Queue ID652
Statuswithdrawn
Source statusW
MarketME
TechnologyGeneration
Capacity460.0 MW
StateMaine
CountyLewiston
Point of interconnectionLarrabee Road 345 kV Substation in Lewiston, Androscoggin county Maine 04240.
Requested (queue) date2017-06-01
Proposed in-service date2020-12-31
Operational date
Withdrawn date2018-04-12
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata