ACEC Lewiston Tap (X-68) - ACEC Lewiston 138.0kV (J1732)

ACEC Lewiston Tap (X-68) - ACEC Lewiston 138.0kV is a 98.4 MW solar interconnection project in Columbia, Wisconsin with a current status of operational. It is proposed to connect at ACEC Lewiston Tap (X-68) - ACEC Lewiston 138.0kV.

98.4 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameACEC Lewiston Tap (X-68) - ACEC Lewiston 138.0kV
Queue IDJ1732
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity98.4 MW
StateWisconsin
CountyColumbia
Point of interconnectionACEC Lewiston Tap (X-68) - ACEC Lewiston 138.0kV
Requested (queue) date2020-06-24
Proposed in-service date2024-12-31
Operational date2024-12-31
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata