Adair - Appanoose 161 kV Line Tap (J1185)

Adair - Appanoose 161 kV Line Tap is a 200.0 MW wind interconnection project in Putnam County, Missouri with a current status of withdrawn. It is proposed to connect at Adair - Appanoose 161 kV Line Tap.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameAdair - Appanoose 161 kV Line Tap
Queue IDJ1185
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateMissouri
CountyPutnam County
Point of interconnectionAdair - Appanoose 161 kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2020-09-30
Operational date2020-09-30
Withdrawn date2019-04-24
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.