Adair (L0672)

Adair is a 11.0 MW other interconnection project with a current status of active. It is proposed to connect at Adair tap to Salem-Albany No. 1 115 kV line.

11.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical nameAdair
Queue IDL0672
Statusactive
Source statusSTUDY
Market
TechnologyOther
Capacity11.0 MW
State
CountyBenton
Point of interconnectionAdair tap to Salem-Albany No. 1 115 kV line
Requested (queue) date2025-11-03
Proposed in-service date2027-12-31
Operational date
Withdrawn date
DeveloperConsumers Power, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata