AES Maui Kuihelani Solar Hybrid (64256_KLNIB)

AES Maui Kuihelani Solar Hybrid is a 60.0 MW battery interconnection project in Maui, Hawaii with a current status of operational.

60.0 MWCapacity
OperationalStatus
HECOMarket
BatteryTechnology

Project facts

Canonical nameAES Maui Kuihelani Solar Hybrid
Queue ID64256_KLNIB
Statusoperational
Source status(OP) Operating
MarketHECO
TechnologyBattery
Capacity60.0 MW
StateHawaii
CountyMaui
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2024-05-01
Withdrawn date—
Developer—
Utility / transmission ownerAES Distributed Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.