AES Waiawa Phase 2 Solar (66066_WAIBA)

AES Waiawa Phase 2 Solar is a 30.0 MW battery interconnection project in Honolulu, Hawaii with a current status of active.

30.0 MWCapacity
ActiveStatus
HECOMarket
BatteryTechnology

Project facts

Canonical nameAES Waiawa Phase 2 Solar
Queue ID66066_WAIBA
Statusactive
Source status(V) Under construction, more than 50 percent complete
MarketHECO
TechnologyBattery
Capacity30.0 MW
StateHawaii
CountyHonolulu
Point of interconnection
Requested (queue) date
Proposed in-service date2026-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAES Distributed Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.