Airport Substation is a 25.0 MW other interconnection project in Walla Walla, Washington with a current status of active. It is proposed to connect at Walla Walla-Tucannon 115kV Line.

25.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameAirport Substation
Queue IDL0410
Statusactive
Source statusSTUDY
MarketWA
TechnologyOther
Capacity25.0 MW
StateWashington
CountyWalla Walla
Point of interconnectionWalla Walla-Tucannon 115kV Line
Requested (queue) date2017-03-20
Proposed in-service date2020-10-01
Operational date
Withdrawn date
DeveloperColumbia Rural Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata