Airport Substation Load Addition (L0671)

Airport Substation Load Addition is a 24.0 MW other interconnection project with a current status of active. It is proposed to connect at Albany-Lebanon No. 1 115 kV line.

24.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical nameAirport Substation Load Addition
Queue IDL0671
Statusactive
Source statusSTUDY
Market
TechnologyOther
Capacity24.0 MW
State
CountyBenton
Point of interconnectionAlbany-Lebanon No. 1 115 kV line
Requested (queue) date2025-11-03
Proposed in-service date2027-09-30
Operational date
Withdrawn date
DeveloperConsumers Power, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata