Airport Substation Load Addition (L0671)
Airport Substation Load Addition is a 24.0 MW other interconnection project with a current status of active. It is proposed to connect at Albany-Lebanon No. 1 115 kV line.
24.0 MWCapacity
ActiveStatus
—Market
OtherTechnology
Project facts
| Canonical name | Airport Substation Load Addition |
|---|---|
| Queue ID | L0671 |
| Status | active |
| Source status | STUDY |
| Market | — |
| Technology | Other |
| Capacity | 24.0 MW |
| State | — |
| County | Benton |
| Point of interconnection | Albany-Lebanon No. 1 115 kV line |
| Requested (queue) date | 2025-11-03 |
| Proposed in-service date | 2027-09-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Consumers Power, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata