AL Queue Project 254 — Other in Limestone, Alabama
AL Queue Project 254 — Other in Limestone, Alabama is a 155.0 MW other interconnection project in Limestone, Alabama with a current status of active. It is proposed to connect at BFN 500-kV Substation.
155.0 MWCapacity
ActiveStatus
ALMarket
OtherTechnology
Project facts
| Canonical name | AL Queue Project 254 — Other in Limestone, Alabama |
|---|---|
| Queue ID | 254 |
| Status | active |
| Source status | Interconnection Agreement |
| Market | AL |
| Technology | Other |
| Capacity | 155.0 MW |
| State | Alabama |
| County | Limestone |
| Point of interconnection | BFN 500-kV Substation |
| Requested (queue) date | 2014-08-15 |
| Proposed in-service date | 2018-04-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tennessee Valley Authority |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.