Alabama Power 24C-IC-1214 (24C-IC-1214)

Alabama Power 24C-IC-1214 is a 120.0 MW solar interconnection project in Houston County, Alabama with a current status of active. It is proposed to connect at Farley - Pinckard 230 kV Line.

120.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power 24C-IC-1214
Queue ID24C-IC-1214
Statusactive
Source statusGIA with NTP
MarketAL
TechnologySolar
Capacity120.0 MW
StateAlabama
CountyHouston County
Point of interconnectionFarley - Pinckard 230 kV Line
Requested (queue) date2023-12-13
Proposed in-service date2027-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.