Alabama Power 24C-IC-1234 (24C-IC-1234)

Alabama Power 24C-IC-1234 is a 175.0 MW solar interconnection project in Marengo County, Alabama with a current status of active. It is proposed to connect at Bassett Creek - Greene County 230 kV Line.

175.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power 24C-IC-1234
Queue ID24C-IC-1234
Statusactive
Source statusGIA in Suspension
MarketAL
TechnologySolar
Capacity175.0 MW
StateAlabama
CountyMarengo County
Point of interconnectionBassett Creek - Greene County 230 kV Line
Requested (queue) date2024-01-09
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata