Alabama Power 24C-IC-1234 (24C-IC-1234)
Alabama Power 24C-IC-1234 is a 175.0 MW solar interconnection project in Marengo County, Alabama with a current status of active. It is proposed to connect at Bassett Creek - Greene County 230 kV Line.
175.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology
Project facts
| Canonical name | Alabama Power 24C-IC-1234 |
|---|---|
| Queue ID | 24C-IC-1234 |
| Status | active |
| Source status | GIA in Suspension |
| Market | AL |
| Technology | Solar |
| Capacity | 175.0 MW |
| State | Alabama |
| County | Marengo County |
| Point of interconnection | Bassett Creek - Greene County 230 kV Line |
| Requested (queue) date | 2024-01-09 |
| Proposed in-service date | 2028-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Alabama Power Co |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata