Alabama Power 24C-IC-1266 (24C-IC-1266)

Alabama Power 24C-IC-1266 is a 200.0 MW solar interconnection project in Bullock County, Alabama with a current status of active. It is proposed to connect at Thurlow Dam - Union Springs 115 kV Line.

200.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power 24C-IC-1266
Queue ID24C-IC-1266
Statusactive
Source statusGIA with NTP
MarketAL
TechnologySolar
Capacity200.0 MW
StateAlabama
CountyBullock County
Point of interconnectionThurlow Dam - Union Springs 115 kV Line
Requested (queue) date2024-03-22
Proposed in-service date2027-11-19
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata