Alabama Power 24S-IC-1210 (24S-IC-1210)

Alabama Power 24S-IC-1210 is a 150.0 MW battery interconnection project in Walker County, Alabama with a current status of active. It is proposed to connect at Goodsprings Substation 230 kV Bus.

150.0 MWCapacity
ActiveStatus
ALMarket
BatteryTechnology

Project facts

Canonical nameAlabama Power 24S-IC-1210
Queue ID24S-IC-1210
Statusactive
Source statusGIA with NTP
MarketAL
TechnologyBattery
Capacity150.0 MW
StateAlabama
CountyWalker County
Point of interconnectionGoodsprings Substation 230 kV Bus
Requested (queue) date2023-12-08
Proposed in-service date2026-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata