Alabama Power 25-IC-1308 is a 897.0 MW gas interconnection project in Houston County, Alabama with a current status of active. It is proposed to connect at Farley NP Substation 500 kV Bus.
897.0 MWCapacity
ActiveStatus
ALMarket
GasTechnology
Project facts
| Canonical name | Alabama Power 25-IC-1308 |
|---|---|
| Queue ID | 25-IC-1308 |
| Status | active |
| Source status | GIA Draft |
| Market | AL |
| Technology | Gas |
| Capacity | 897.0 MW |
| State | Alabama |
| County | Houston County |
| Point of interconnection | Farley NP Substation 500 kV Bus |
| Requested (queue) date | 2025-04-01 |
| Proposed in-service date | 2029-11-18 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Alabama Power Co |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata