Alabama Power 25-IC-1336 (25-IC-1336)

Alabama Power 25-IC-1336 is a 93.0 MW solar interconnection project in Clarke County, Alabama with a current status of active. It is proposed to connect at Walker Springs Solar Farm Substation 230 kV Bus.

93.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power 25-IC-1336
Queue ID25-IC-1336
Statusactive
Source statusGIA Draft
MarketAL
TechnologySolar
Capacity93.0 MW
StateAlabama
CountyClarke County
Point of interconnectionWalker Springs Solar Farm Substation 230 kV Bus
Requested (queue) date2025-04-14
Proposed in-service date2029-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata