Alabama Power 25-IC-1354 (25-IC-1354)

Alabama Power 25-IC-1354 is a 91.0 MW solar interconnection project in Dale County, Alabama with a current status of active. It is proposed to connect at Ewell SS - Pinckard 115 kV Line.

91.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power 25-IC-1354
Queue ID25-IC-1354
Statusactive
Source statusGIA Executed; NTP Pending
MarketAL
TechnologySolar
Capacity91.0 MW
StateAlabama
CountyDale County
Point of interconnectionEwell SS - Pinckard 115 kV Line
Requested (queue) date2025-04-16
Proposed in-service date2029-07-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.