Alabama Power 25-IC-1361 (25-IC-1361)

Alabama Power 25-IC-1361 is a 170.0 MW solar interconnection project in Cherokee County, Alabama with a current status of active. It is proposed to connect at Hammond - Weiss Dam 115 kV Line.

170.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power 25-IC-1361
Queue ID25-IC-1361
Statusactive
Source statusGIA Draft
MarketAL
TechnologySolar
Capacity170.0 MW
StateAlabama
CountyCherokee County
Point of interconnectionHammond - Weiss Dam 115 kV Line
Requested (queue) date2025-04-17
Proposed in-service date2029-09-03
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata